Guilin (southern) cement low-temperature WHR power generation project was connected to grid successfully on June 2nd, 2010.

Release time:

2010-06-28


On June 2nd, 2010, a 5000t/d cement clinker production line with 9MW installed capacity low-temperature WHR power generation project of Guilin (Southern) Cement Co., Ltd. connected to grid successfully.